Project Description

The Challenge

A High School was low on space and needed to store shop supplies in an accessible, limited footprint. The supplies were an important resource for the courses and had to be secured, and accessible on demand when classes required them. The ceiling in the storage space presented a challenge because there were low hanging bulk heads that had to be cleared by the mobile system.

The Solution

McLennan & Company worked with the General Contractor to create and install the perfect Mizer storage system. The system allowed instant access to almost 50% more capacity, and thanks to Mizer’s low overall height (compared to our competitors) the bulk heads remained in place and un touched. The system was fitted with four post shelving which allowed for endless shelving configurations for their diverse products and changing needs. A locking tambour door was placed on one section for valuable supplies and control. The system increased the storage capacity, while remaining accessible, and secure.